Free tool and guide
Commercial construction loan calculator with the interest reserve, worked out
A construction loan is paid out in draws as the building goes up, so interest builds on a balance that grows. Enter your project cost, loan-to-cost, rate and term below to see the loan, the equity, the interest and the reserve to cover it.
A commercial construction loan is financing that a lender pays out in stages as a building is built, and that a permanent loan, often called a take-out, later replaces. Interest during construction is a project cost, so lenders budget for it in an interest reserve. On a $10,000,000 project at 65% loan-to-cost, an 8% rate and 18 months, the interest comes to about $409,500.
Commercial construction loan calculator
Enter project cost, loan-to-cost, rate, term and draw timing to get the loan, equity, interest during construction, interest reserve and total cost. It runs in your browser: your numbers are not uploaded, saved or tracked, and there is no sign-up.
- Loan amount
- $6,500,000
- 65% of project cost
- Equity required
- $3,500,000
- Project cost less the loan
- Estimated interest during construction
- $409,500
- Interest on the balance drawn, month by month. Worked over 18 months
- Interest reserve
- $450,450
- Interest plus a 10% cushion
- Total cost including interest
- $10,409,500
- Project cost plus estimated interest
- Loan share of cost plus interest, if equity pays the interest
- 62.4%
- Not a loan-to-cost. Assumes the interest sits outside the loan
Worth a look
- The loan here is sized on the project cost entered. If your lender funds the interest reserve inside the loan, the loan and the reserve are both larger. Ask for the lender's own sizing.
Arithmetic only, with no market benchmarks. This is not a loan quote or advice.
How this calculator works
Loan = project cost x loan-to-cost. Equity = project cost - loan. This calculator assumes the share of the loan you enter is drawn at closing, and the rest is drawn in equal draws at the end of each month of the term. Interest each month is the balance drawn so far x the annual rate / 12.
Interest during construction = loan x annual rate / 12 x months at full balance, where months at full balance = term x closing share + (1 - closing share) x (term - 1) / 2. Interest reserve = interest x (1 + cushion). Total cost including interest = project cost + interest. Terms above 120 months return n/a in the tool.
| You enter | You get | Formula |
|---|---|---|
| Cost and loan-to-cost | Loan | Cost x LTC |
| Cost and loan | Equity | Cost - loan |
| Loan, rate, term, draws | Interest | Loan x rate / 12 x months at full balance |
| Interest and cushion | Interest reserve | Interest x (1 + cushion) |
A worked example
A $10,000,000 project at 65% loan-to-cost needs a $6,500,000 loan and $3,500,000 of equity. With an 8% rate, an 18-month term and 10% of the loan drawn at closing, the balance is outstanding for the equivalent of 9.45 months at full size, so interest is $409,500.
With a 10% cushion the interest reserve is $450,450, and the total cost including interest is $10,409,500. The even draws are why the interest is far below what 8% on the full loan for 18 months would cost: for much of the term, much of the loan has not been drawn yet.
How a construction loan differs from a permanent loan
The Office of the Comptroller of the Currency (OCC) says permanent loans, also called take-outs, are term loans that replace construction loans, and that they may come from the construction lender or another lender (OCC Comptroller's Handbook, Commercial Real Estate Lending, March 2022, checked 2026-11-11). So the two loans do different jobs: one pays for building, the other holds the finished property. Compare the second with the commercial mortgage calculator.
| Construction loan | Permanent loan (take-out) | |
|---|---|---|
| Job | Pays for the building while it is built | Replaces the construction loan |
| Funds | Paid out in draws as work is verified | Funded as a term loan |
| Who lends | A bank, with construction controls | The same lender or another, such as an insurer or a CMBS lender |
The OCC adds that take-out commitments can be standby, as back-up financing, or forward, to refinance after completion and, almost always, lease-up, and that either can depend on performance tests such as lease-up. The OCC says such commitments may mitigate little of the risk the construction lender takes.
How draws work
- Equity goes first. The OCC says a bank's policy should state that equity is contributed before construction loan disbursements begin (OCC handbook, checked 2026-11-11). That is why the calculator treats the loan as the part you borrow, and the equity as the rest.
- Draws follow verified work. The OCC says banks typically require architect or engineering inspection reports with each draw, and that disbursements are typically based on percentage complete (OCC handbook, checked 2026-11-11).
- Multi-phase loans. For a loan that funds several phases of one project, such as land development and then construction, the federal real estate lending guidelines say the loan-to-value limit is the one for the final phase, and that disbursements should not exceed actual development or construction outlays (12 CFR Part 365, Appendix A, checked 2026-11-11).
Real draw schedules follow the budget and the work, not a straight line. Use the closing share and term here to test an even schedule, then change them to see how much timing moves the interest.
What an interest reserve is
The OCC defines an interest reserve as a reserve account established by the lender and used by the borrower to cover loan interest during construction and lease-up. It says the reserve is typically funded through a budget line item in the construction loan, and may instead be funded by the borrower into a separate escrow account as a condition of the loan (OCC handbook, checked 2026-11-11).
The same handbook says an appropriate reserve provides enough money to pay interest through the project's anticipated completion and lease-up, sale or occupancy, and that it should reflect the timing of expected disbursements and possible changes in interest rates. This calculator reserves interest for the construction term only. It does not model lease-up, sale or occupancy after completion, which the OCC says an appropriate reserve should also cover. The cushion input is a simple allowance for delay inside the term you enter, and it does not stand in for those later months.
Two points from the OCC. First, having to refill a depleted reserve may point to an underperforming construction process, whether the bank or the borrower funds the refill, and adding more debt to the reserve is a red flag. Second, where the bank is not funding the interest, the OCC asks whether there is enough equity for the bank to fund it if necessary while keeping the loan within its loan-to-cost and loan-to-value limits, even if the borrower intends to pay the interest from its own funds.
Loan-to-cost, loan-to-value and your lender
Federal guidelines list a supervisory loan-to-value limit of 80% for construction of commercial, multifamily and other nonresidential property. They also allow exceptions: lenders may make loans above a supervisory limit "based on the support provided by other credit factors," as long as the aggregate of all such loans "should not exceed 100 percent of total capital" (12 CFR Part 365, Appendix A, checked 2026-11-11). The 80% is a limit on loan-to-value, which divides the loan by the property's value, and not on loan-to-cost, which divides it by what the project costs. A lender applies its own limits, and the two ratios can differ.
This page publishes no loan-to-cost range, rate or fee. Those depend on the lender, the borrower, the property type and the market, so the defaults in the calculator are inputs to replace with your lender's terms.
SBA 504 loans and construction
The U.S. Small Business Administration lists the purchase, construction or renovation of existing buildings or land among the uses of a 504 loan, and says speculation or investment in rental real estate is not eligible (SBA, 504 loans, checked 2026-11-11). Its wording is about existing buildings or land, so ask a Certified Development Company whether a ground-up project qualifies. 504 loans are available only through Certified Development Companies, which work with a senior lender.
Multifamily and other property types
The formulas do not change by property type, but the lender's terms can. The federal supervisory loan-to-value limit above treats commercial, multifamily and other nonresidential construction in one category. For a multifamily or other income property, also test what the finished building earns with the DSCR calculator and the debt yield calculator, since the take-out will be sized on them.
Sources
- OCC. Comptroller's Handbook, Commercial Real Estate Lending, Version 2.0, March 2022: https://www.occ.gov/publications-and-resources/publications/comptrollers-handbook/files/commercial-real-estate-lending/pub-ch-commercial-real-estate.pdf (checked 2026-11-11).
- FDIC and federal banking agencies. Real Estate Lending Standards, 12 CFR Part 365, Appendix A, Interagency Guidelines for Real Estate Lending Policies: https://www.law.cornell.edu/cfr/text/12/appendix-A_to_subpart_A_of_part_365 (checked 2026-11-11).
- SBA. 504 loans: https://www.sba.gov/funding-programs/loans/504-loans (checked 2026-11-11).
Frequently asked
- How do you calculate interest on a commercial construction loan?
- Charge the rate on the balance drawn each month, not on the whole loan. With even draws, interest is the loan x annual rate / 12 x the months at full balance, which is less than the term because the loan is drawn gradually.
- What is an interest reserve on a construction loan?
- A reserve account that covers loan interest during construction and lease-up. It is usually a budget line in the construction loan, and may instead be funded by the borrower into an escrow account.
- What is the difference between a construction loan and a permanent loan?
- A construction loan pays for the building in draws. A permanent loan, also called a take-out, replaces it as a term loan after construction.
- What loan-to-cost can I get on a commercial construction loan?
- It depends on the lender and the project, so ask yours. The loan-to-cost in this calculator is an input. A federal supervisory limit exists for loan-to-value on construction, which is a different ratio.
- Are multifamily construction loans different from other commercial construction loans?
- The mechanics of draws, interest and take-out are the same. Lender terms can differ by property type, so get quotes for yours.
- Can SBA 504 loans pay for construction?
- The SBA lists construction among 504 uses, but its wording refers to existing buildings or land, so confirm a ground-up project with a Certified Development Company.
Keep reading
Commercial mortgage calculator
Payment, balloon, LTV and DSCR for a commercial loan.
DSCR calculator
Debt service coverage, and the largest loan a DSCR supports.
Debt yield calculator
The lender's rate-free test of a loan's size.
Pacific Software Ventures built this tool and guide, and sells AI consulting and training to commercial real estate firms. This is general education, not investment, legal or tax advice.
Next step
Doing this on every deal? Let AI do the first read.
Ten minutes. An honest read on where AI would save your team time, and which option fits, including when it is not us.