A tenant improvement allowance is what a landlord contributes to build out a tenant's space. Enter the allowance, the build-out cost and the area below to see the total, any cost above it, and what amortizing it does to the rent.

A tenant improvement (TI) allowance is an amount, usually stated per square foot, that a landlord contributes toward building out the space a tenant leases. The tenant uses it for the work, pays any cost above it, or has the landlord fund the excess and recover it through rent. To the landlord it is a concession, so it lowers the net effective rent.

TI allowance calculator

Enter the area, the allowance and the build-out cost per square foot, plus a rate and a term for any cost above the allowance, to get the total allowance, the amortized TI added to rent, and the base rent less the allowance. It runs in your browser: your numbers are not uploaded, saved or tracked, and there is no sign-up.

The rate the landlord charges to recover cost above the allowance. Set by your lease.

Often the lease term. Set by your lease.

Total TI allowance
$400,000
Allowance per SF times the area
Build-out cost above the allowance
$150,000
Amortized TI, per SF per year
$2.18 per SF
Cost above the allowance, spread over the years at the rate entered
Rent including amortized TI
$32.18 per SF per year
Total amortized TI over the term
$218,390
Includes interest
Allowance per SF per year
$4.00 per SF
Spread over the years, no discounting
Base rent less allowance, per SF per year
$26.00 per SF per year
Flat rent, allowance only; the landlord-funded excess is not netted. Escalations, free rent and commissions are in the net effective rent calculator

Worth a look

  • Cost above the allowance is treated as paid back through rent, with interest, over the years entered. If the tenant pays it upfront instead, there is no amortized TI.

Arithmetic only, with no market benchmarks. This is not a loan quote or advice.

What a TI allowance is

Total allowance = allowance per SF x leased area. It is the landlord's contribution to the build-out, written into the lease, usually together with a work letter that says how the work is done and how the money is paid out.

The allowance is one of the terms a tenant and landlord trade against the rent. A higher allowance can come with a higher rent, a longer term, or both, so compare leases on what they cost over the term and not on one number.

A worked example

A tenant leases 10,000 square feet with a $40 per square foot allowance. The total allowance is $400,000. The build-out costs $55 per square foot, so $150,000 falls above the allowance.

If the landlord funds that excess and recovers it through rent over ten years at 8%, it adds $2.18 per SF per year, and a $30 base rent becomes $32.18 per SF per year. Over the term the tenant pays back $218,390, which includes the interest.

What a TI allowance covers

  • Usually the build-out itself: partitions, ceilings, floor finishes, lighting, and extensions of the building's systems into the space.
  • Often a matter of negotiation: design and engineering fees, permits, and project management.
  • Often excluded: furniture, fixtures, equipment, signage and moving costs, unless the lease says otherwise.

Leases differ, so the work letter and the lease control. Check also whether the allowance must be used by a deadline, and what happens to any part that is not used.

Allowance, turnkey and free rent compared

StructureHow it worksWho carries the cost
TI allowanceThe landlord pays up to a set amount per square foot toward the work, which is run to the tenant's plansThe landlord up to the allowance, the tenant above it
Turnkey buildThe landlord delivers finished space to plans agreed in the leaseThe landlord, within the agreed plans
Free rentThe landlord waives rent for some months instead of paying cash toward the workThe tenant pays for the work, and the landlord gives up rent
Amortized TIThe landlord funds cost above the allowance and recovers it through rent, with interestThe tenant, over the term, with the landlord financing it

The structures differ in when cash moves. An allowance and a turnkey build put the landlord's money in at the start. Free rent gives it up over the first months. Amortized TI puts it back through rent over the term.

How a TI allowance shows up in net effective rent

To the landlord, the allowance is a cost of getting the tenant, like free rent and leasing commissions. The net effective rent calculator takes it off the rent over the term. Its own description of the result is: after free rent, ti and commissions, no discounting.

The tool above shows the allowance on its own. It spreads the allowance over the years and takes it off a flat rent, with no escalations, free rent or commissions. Use the net effective rent calculator when the lease has any of them. If the rent includes amortized TI, compare it with a lease that has none on the same basis.

What to check in the lease and the work letter

  • The amount and the area it is multiplied by, and whether the area is rentable or usable.
  • Who builds and who approves the plans and the contractor.
  • How it is paid: as costs are incurred, on completion, or by reimbursement against invoices and lien waivers.
  • The deadline, and what happens to an unused allowance.
  • Cost above the allowance: paid upfront by the tenant, or amortized into rent, and at what rate and over what term.
  • Early termination: whether the tenant must repay the part of the allowance not yet recovered through rent.

This page is general information, not legal advice. Have a lawyer review the lease for your side.

Frequently asked

What is a tenant improvement allowance?
A tenant improvement (TI) allowance is money a landlord contributes toward building out the space a tenant leases, usually stated per square foot. A $40 allowance on 10,000 square feet is $400,000. The lease says what it can be spent on and when.
What does a TI allowance cover?
It is meant for the build-out of the space, such as walls, ceilings, floors, lighting and building systems inside the premises. Leases differ on design and permit fees, project management, and furniture, fixtures and equipment, so read the work letter.
What is the difference between a TI allowance and a turnkey build?
With an allowance, the landlord pays up to a set amount and the build-out is run to the tenant's plans, with the tenant paying any excess. With a turnkey build, the landlord delivers finished space to agreed plans and carries the cost.
What happens if the build-out costs more than the allowance?
The tenant pays the difference, or the lease lets the landlord pay it and recover it through higher rent over the term, with interest. That is amortized TI, and the calculator above shows its effect on the rent.
How does a TI allowance affect net effective rent?
It lowers it. A landlord's allowance is a concession, so net effective rent takes it off the rent the lease pays over its term, along with any free rent and commissions. The net effective rent calculator does the full calculation.